Clothing set [CLOSED] 007 James bond 'Skyfall' Tomford Outfit - rourestudios

Custom One-Sixth Figures Forum

Help Support Custom One-Sixth Figures Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
The prototype product is complete.
This was sent to Juri now.
I will receive the balance after the final disclosure in a few days
 
IMG_20220818_204843_901.jpg
 

Hi Hwana,

Two items need more work and adjustment. The shirt should be a light blue color and not white color and the collar is not a spread collar . The collar should be a tap collar. Both adjustment very important.
Also, not sure but the waist of the jacket looks maybe too wide in your picture. Something is off.
 

Attachments

  • 80662A6B-0783-4C34-9B03-C14EAE333710.png
    80662A6B-0783-4C34-9B03-C14EAE333710.png
    9.6 MB · Views: 0
Last edited:
After looking at them side by side the new one seem a lot less accurate.
The things I’m noticing are:
• Shirt Colour should be blue not white
• collar is wrong
• suit looks too dark compared to before but that could be the lighting
• lapels look wrong as should be foldable to cover top button.
• looks I’ll fitted in waist on body compared to earlier prototype
 

Attachments

  • 2DCD4545-C838-4C98-8D9A-616F33235625.jpeg
    2DCD4545-C838-4C98-8D9A-616F33235625.jpeg
    500.1 KB · Views: 0
After looking at them side by side the new one seem a lot less accurate.
The things I’m noticing are:
• Shirt Colour should be blue not white
• collar is wrong
• suit looks too dark compared to before but that could be the lighting
• lapels look wrong as should be foldable to cover top button.
• looks I’ll fitted in waist on body compared to earlier prototype

Hi Joker

You are right. 3 button row is now missing on the top button. The real collar is missing now.
 
Hello friend

I am very worried about the schedule of this project.

The original schedule for this project is about time for mass production to be completed.

However, due to the producer's schedule, it is very late, so I am going to cancel this project.

I'm really sorry to the participants.

I would like to refund the deposit to everyone in consultation with the manufacturer.

I will proceed with the refund to everyone who sent the money to me.

Participants who receive the transfer request a refund from the transferor

Refund start date: 2022.08.22.(MON) Korea

Thank you.
 
Last edited:
Back
Top