SeeArt Active member Joined Nov 7, 2018 Messages 349 Reaction score 127 Location 🇰🇷 Dec 23, 2023 #21 2st ProtoType [3 LEFT] Last edited: May 14, 2024
SeeArt Active member Joined Nov 7, 2018 Messages 349 Reaction score 127 Location 🇰🇷 Jan 20, 2024 #22 The deadline is approaching soon. If you need more time, please let me know in advance thanks
SeeArt Active member Joined Nov 7, 2018 Messages 349 Reaction score 127 Location 🇰🇷 Jan 27, 2024 #23 I would like to inform your that IRIS John Wick balance deadline is just around the corner. D-1
SeeArt Active member Joined Nov 7, 2018 Messages 349 Reaction score 127 Location 🇰🇷 May 14, 2024 #24 - 24.05.14 UPDATE - (4 LFET)Recommend Body :HT Doctor Strange Body + TTM18 Armor TTM21 / M01 + TTM18 Arm『Hello, the sample is finally completed.After the first sample,I widened the shoulder width of the jacket, and slimmed down the pants slightly.The shirts are magnetically operated, and all real buttons.The sleeve of the shirt has a cuff buttons.The schedule for completing mass production is October to November』Thank you all
- 24.05.14 UPDATE - (4 LFET)Recommend Body :HT Doctor Strange Body + TTM18 Armor TTM21 / M01 + TTM18 Arm『Hello, the sample is finally completed.After the first sample,I widened the shoulder width of the jacket, and slimmed down the pants slightly.The shirts are magnetically operated, and all real buttons.The sleeve of the shirt has a cuff buttons.The schedule for completing mass production is October to November』Thank you all
SeeArt Active member Joined Nov 7, 2018 Messages 349 Reaction score 127 Location 🇰🇷 Today at 2:05 AM #25 Hi, everyone here. Currently, unfortunately, there is a delay in production. I'm sorry, and I ask for your understanding. The production completion schedule is February 2025 thanks a lot
Hi, everyone here. Currently, unfortunately, there is a delay in production. I'm sorry, and I ask for your understanding. The production completion schedule is February 2025 thanks a lot