Update:
Feb 20/2013: I will be painting the bases this weekend, and adding the water effects. The next week i will be working on the walk-way and hand rails
Hey Guys,
just wondering if there was any interest for one of these pieces made by me.
I was thinking of extending the cement bank a little further. The reason mine is short is because I have it displayed in this shelf
https://i299.photobucket.com/albums/mm320/cto15/Action Figures/Hot Toys/IMG_1646.jpg
Specifications on Dio
H x W x D
"Short Verison"
13.5 x 14.5 x 14.5" (for the one shown in my photo)
The "longer version" - will have more of the cement bank included.
13.5 x 20 x 14.5
I'm looking at making 5 for now.
As for price, the piece will be $200 (CAD) + shipping.
When I gauged enough interest, there will be a $15 deposit. (in Canadian Dollars)
In terms of timeline, I'm looking at completing the 5 dios in a span of 1.5 months. I am a full time engineering student, so I believe this is a realistic timeline.
let me know guys
Feb 20/2013: I will be painting the bases this weekend, and adding the water effects. The next week i will be working on the walk-way and hand rails
Hey Guys,
just wondering if there was any interest for one of these pieces made by me.
I was thinking of extending the cement bank a little further. The reason mine is short is because I have it displayed in this shelf
https://i299.photobucket.com/albums/mm320/cto15/Action Figures/Hot Toys/IMG_1646.jpg
Specifications on Dio
H x W x D
"Short Verison"
13.5 x 14.5 x 14.5" (for the one shown in my photo)
The "longer version" - will have more of the cement bank included.
13.5 x 20 x 14.5
I'm looking at making 5 for now.
As for price, the piece will be $200 (CAD) + shipping.
When I gauged enough interest, there will be a $15 deposit. (in Canadian Dollars)
In terms of timeline, I'm looking at completing the 5 dios in a span of 1.5 months. I am a full time engineering student, so I believe this is a realistic timeline.
let me know guys
Last edited: